Back-order / expected dispatch information One or more items in your basket are currently on back-order and are not available for immediate dispatch.
Power Systems G-TEC 1113-500DF | 41 CFM 13 Bar Full Feature G Tec Air Compressor 500 Litre Receiver with Dryer + Dual Filtration — Expected dispatch: estimated between 28 August 2026 and 11 September 2026 — normally within 4–6 weeksPower Systems G-TEC 7.510-500 DF | 35 CFM 10 Bar Full Feature G Tec Air Compressor 500 Litre Receiver with Dryer + Dual Filtration — Expected dispatch: estimated between 28 August 2026 and 11 September 2026 — normally within 4–6 weeksStock and ETA information last updated: 31 July 2026.
Expected dispatch dates and lead times are estimates only and may be affected by supplier availability, customs clearance, manufacturer delays, stock allocation changes, shipping delays, port delays, courier disruption, or other circumstances outside of our control.